Report

Plant report

The problem The weekly report is built by hand, with numbers from different sources.

intellifix · Report E-mail preview
Data it needs
The modules' official numbers
Areas of the operation
Production lines, batches, alarms and utilities
Integrates with
IPM · APC · vRover
How it starts
14-day free trial
What it does

From the close of the period to the inbox of whoever decides.

The periodic report generated with the modules' official numbers, ready to send.

The modules' official numbers
  • Sections composed by the plant itself, in its own order
  • Official numbers from the modules, with no parallel recalculation
  • A draft written by the system and reviewed by Felix
Module screens

The interface, screen by screen.

Captures from the running application, with demonstration data.

intellifix · Report E-mail preview
E-mail preview
intellifix · Report E-mail preview
E-mail preview
How it works

From the data that comes in to the decision that goes out.

  1. 1

    The plant composes the sections

    OEE by line, losses, alarms, machine states, batches, energy or a screen widget: each one with the title and the scope the plant chooses.

  2. 2

    The period closes on the plant's clock

    Daily, weekly or monthly, at the hour the plant picks, in its own time zone. Each number comes from the module that owns it.

  3. 3

    The text comes from the numbers

    The system writes the draft from the tables, compared with the previous period, and Felix only rewrites it. A seal says which text is on screen.

  4. 4

    The e-mail reaches who needs it

    One card per section in the body, the full PDF if the plant wants it, and a link to that period on screen. Deliveries show who received it and who opened it.

Requirements

What it takes to go live.

Data it needs

The modules' official numbers

This is the hard requirement. Without it, the capability has nothing to read.

What the plant needs

  • Efficiency (OEE) already in use at the plant, with its lines registered.
  • Who receives it: people and groups, each with permission to view reports.
  • The cadence and the hour the period closes, in the plant's time zone.
  • An e-mail service configured for the plant.
Where it acts

Where it acts in the plant.

Results delivered

What becomes possible.

  • The report goes out on its own when the period closes, with nobody building a spreadsheet.
  • The manager's number is the same as the one on the supervisor's screen, because it comes from the same module.
  • A source that is down never turns into a low number in a decision maker's inbox.
  • Who received it, who opened it and what was sent each period stay on record.
Examples of use

On the floor, it looks like this.

A source down at send time

The period is held back instead of going out with a low number, and the warning goes to whoever runs the report. It can still go out once the source is back.

The manager asks whether it got better

Every period sent is kept, and the draft already compares with the previous one: OEE in points, the rest as a percentage change.

A report that stopped going out and nobody noticed

Switched on and silent for two periods, it warns whoever runs it, and the sending panel marks it as late.

Benefits by role

What each side of the operation gains.

Operation

With the shift on the list, it gets the day at a glance, and the link opens exactly that period on screen.

Report administrators

They build the report once, preview the e-mail, send themselves a test and follow every delivery.

Management

Management gets the official numbers for each period, with the Focus priorities and the comparison against the previous period.

Integrations

It does not work alone.

Every capability reads from and feeds the others. What this one exchanges inside the operation:

OEE

Efficiency and losses

OEE by line, losses by reason, alarms, machine states and stop causes come ready from the efficiency module, with no second calculation.

Open capability
IPM

Monitor the process

The batch-by-equipment section reads the lots and each equipment's OEE from the process module, and counts each lot once, on its main unit.

Open capability
Cyber

Plant network security

The backup section shows the jobs in the window, the ones that stopped running and how full each repository is, and only goes to people who can also see network security.

Open capability
Report

Want to see this on your own data?

Bring the report your team builds by hand today. In the demo we compose its sections and preview the e-mail.