Operations

Shop floor operation

The problem Information does not reach the people on the line.

intellifix · Operations Material call
Data it needs
Lines, points of use and operator codes
Areas of the operation
Filling, packing and palletizing
Integrates with
IPM · APC · vRover
How it starts
14-day free trial
What it does

What the line needs, asked for and followed from the line itself.

The floor tablet and the line panel: material calls, the operator's plan and tickets.

Lines, points of use and operator codes
  • Material calls by point of use, followed until delivery
  • The operator's plan by machine, day and shift, read only
  • Tickets opened from the line, with the status of each one
Module screens

The interface, screen by screen.

Captures from the running application, with demonstration data.

intellifix · Operations Material call
Material call
intellifix · Operations Operations log
Operations log
How it works

From the data that comes in to the decision that goes out.

  1. 1

    The operator identifies themselves

    A 4-digit operator code opens the session, and the operator picks the packing line. Every request is logged with its author, and the session ends after 5 minutes without a touch.

  2. 2

    The call starts at the point of use

    Each point of use has its own buttons: replenish a pallet at a position, take away empty pallets and cases, or a full waste bin. Nothing is sent before the operator confirms.

  3. 3

    The tablet says what happened

    No stock in the warehouse, no AGV free, a request already active for that position: each case has its own message and says what to do, and a duplicate is blocked before it becomes a double delivery.

  4. 4

    The request is followed to the end

    Active calls shows the AGV, the forecast and the elapsed time, and paints red what is past the forecast. Everything that happened stays in the operations log.

Requirements

What it takes to go live.

Data it needs

Lines, points of use and operator codes

This is the hard requirement. Without it, the capability has nothing to read.

What the plant needs

  • The packing lines, and the positions each one has.
  • Who serves each button: the warehouse or the AGV fleet.
  • A code for each operator who uses the tablet.
  • Each tablet set up for its site and language, with larger buttons for gloved hands when needed.
Where it acts

Where it acts in the plant.

Results delivered

What becomes possible.

  • The line asks for material from the post itself, and knows when the request was accepted.
  • A request past its forecast turns red and is counted, so the delay can be read from across the aisle.
  • Every operation is recorded with the operator, the line and the result.
  • The tablet keeps working when the server is out of reach, and says so on screen instead of hiding it.
Examples of use

On the floor, it looks like this.

A pallet running out at the point of use

The operator replenishes it with one tap and a confirmation, and follows the AGV and the forecast in Active calls.

Two people asking for the same pallet

The second request is blocked before it goes out, and the tablet points to the request that is already in progress.

Communication drops in the middle of a request

No request is created, so there is no risk of a double call, and the tablet says what to do: ask the logistics lead by radio and record it on the contingency form.

Benefits by role

What each side of the operation gains.

Operation

The operator calls material, follows each request and opens a ticket when something needs adjusting, without leaving the post.

Logistics

Each request arrives with line, point of use, position and operator, and the destination of each button is changed in the field, with no new version of the app.

Management

The operations log keeps who asked for what, when and with what result, so supply on the line is discussed with data.

Integrations

It does not work alone.

Every capability reads from and feeds the others. What this one exchanges inside the operation:

MMS

Materials and inventory

The material call is the materials module on the line: each request carries line, point of use, position and operator, and a request with no stock in the warehouse is refused before any AGV is sent.

Open capability
QCP

Quality and deviations

The site's batches and quality forms open on the tablet, and a device set up for it keeps answers and signatures without network until the next sync.

Open capability
PLAN

Plan production

On the tablet the plan is read only, by machine, day and shift, and a comment on any card is how the operator sends information back to whoever plans.

Open capability
Operations

Want to see this on your own data?

Bring the lines and points of use of one area. In the demo we call a material and follow the request on the tablet.